projects and services
frederick/carroll county
renewable waste-to-energy facility
Permit Information
- Slides - Siting Analysis and Revised Materials Separation Plan - Public Meeting (12-7-11)
- Moderator Slides - Siting Analysis and Revised Materials Separation Plan - Public Meeting (12-7-11)
- Notice of Public Meeting - Siting Analysis/Revised Materials Separation Plan, December 7, 2011
- Material Separation Plan (Final Draft - February 2011)
- Siting Analysis (November 2011)
- Map & Directions to the Public Meeting on December 7, 2011 at Frederick County Community College, The Jack B. Kussmaul Theater
- Notice of Informational Meeting - Prevention of Significant Deterioration (PSD), and Non-Attainment New Source Review (NRC) approval applications, and various Permit to Construct Applications, Tuesday, November 1, 2011
- Class II Area Plume Visibility and Air Quality Analysis (November 2011)
- Prevention of Significant Deterioration (PSD)/Air Construction Permit Application (Revised September 2011)
- Refuse Disposal Permit Application Public Informational Meeting Presentation (July 21, 2011)
- Refuse Disposal Permit Application (February 2011, updated July 2011)
- NPDES Public Informational Meeting Presentation (May 23, 2011)
- National Pollutant Discharge Elimination System (NPDES) Permit Application - Revised Pages (May 2011)
- National Pollutant Discharge Elimination System (NPDES) Permit Application (February 2011)
- Slides - Preliminary Draft Materials Separation Plan - Public Meeting (8-30-10)
- Moderator Slides - Preliminary Draft Materials Separation Plan - Public Meeting (8-30-10)
- Preliminary Draft Materials Separation Plan - Notification of Public Meeting
- Preliminary Draft Materials Separation Plan (July 2010)